SETEC Ferroviaire

Secteurs d'activités
- Mining railway system
Autres secteurs
Ports railway system
Informations financières et juridiques
- Forme juridique :
SAS - CA ferroviaire à l’export en € : NC
- Effectifs ferroviaires : 90
Dirigeants
- DROUIN Fabrice [General Manager]
- VIOLLE Sophie [General Manager]
Descriptif / Historique
Setec Ferroviaire, created in 2008 is a subsidiary of the SETEC Group. Setec Ferroviaire is responsible for the quality of all Setec Group assignments related to railway engineering fields, and manages all kind of railway project from the design phase trough to opening.
Setec Ferroviaire addresses all aspects of project management for the construction of new lines and upgrading or redevelopment of existing lines.
Setec Ferroviaire's expertise meet the requirements of all technical specialties related to engineering railway systems such as : alignment ; traction power ; power supply ; overhead line equipment ; signalling ; telecommunication, permanent way ; testing and commissioning ; operation ; and maintenance.
Produits
- Contracting Authority support
- Design and built
- Design and Build/Supervision
- Detailed design
- Preliminary studies
- Project development studies
- Works and studies project management
- Elaboration of tender document and contract management
- Testing and commissioning monitoring before hand over
- Expertise
- Description :
Technical appraisals
Preparation of safety documents and temporary rules book
Activités détaillées
Références
- FIF_QUALIFICATIONS_EN :
French railway network Certification related to : Expertise, advise, support and preliminary design
French railway network Certification related to : Detailed design, works follow up , testing and commissioning
French railway network Certification related to : Project management
ISO 9001 Certification - FIF_REFERENCES_EN :
- High Speed Line Rhine-Rhone Phase 2: Railway System-wide Design/ Supervision/ &C/ and over
- HSL East-Phase 2: Overhead Line Equipment and Feeder system, Design / Supervision/T&C/Hand over
- HSL BPL: PPP, 210 km, in operation in 2016
- HSL CNM: PPP, 70 km, in operation in 2017
- Upgrading Oloron Bedous line to regional passenger traffic
- Upgrading French central lines (Plan Rail Auvergne II)
- Upgrading Paray-le-Monial Montceau-les-Mines line to passenger traffic growth
- Electrification : Moirans- Orléans Châteauneuf
- Eole Subway in Paris
Filiales
- SOTEC, Nancy France